Q01 CAMPUS

Where AI Gets Its Power.

142MW. 100% hydro. Liquid-cooled to 600kW+ per rack. This is what purpose-built looks like.

142 MW
Secured power. Ready now.
100%
Renewable. Every watt.
600kW+
Per rack. Liquid-cooled.

266MVA 2N 120kV ELECTRICAL SUBSTATION

We own the substation. Active-active redundancy. No landlord, no middleman, no bottleneck between you and the grid.

CLEAN

Renewable
Hydroelectricity

Zero carbon. Not an offset — the actual electrons. Quebec hydro, every rack, year-round.

Liquid cooling system diagram

HIGH-DENSITY Liquid & Air Cooling

600kW+ per cabinet. Liquid and air in the same hall. Reinforced floors that don't flinch under your heaviest clusters. Bring everything.

Cooling infrastructure
Q01 Campus Interior
Waste-heat recovery system

UNIQUE Waste Heat, Second Life

Your training runs heat local greenhouses. Thermal energy doesn't leave the economy — it feeds it.

Cold Climate as a COMPETITIVE Advantage

Free cooling 80% of the year. PUE under 1.2. The Canadian winter isn't a problem here — it's the product.

Q01 Campus aerial view

HPE Went Live at Q01. On Time. On Budget.

AI Cloud deployed. 20%+ energy reduction. PUE under 1.2. That's not a projection — it's a receipt.

Read More
HPE AI Cloud deployment
DCD Awards 2023

North American Data Center Project of the Year

Winner at DCD Global Awards 2023

Learn more
STRATEGIC LOCATION

Quebec City Area

20 minutes from the airport. Redundant fiber to Montreal, Toronto, New York, and Europe. Close to everything that matters, far from everything that doesn't.

Quebec location map
Q01 Specifications

Building

Total building space: ~930,000 sq. ft.
Concrete floors with high load per sq. ft.
White space: ~39,000 sq. ft. per phase, total ~313,000 sq. ft.
Flexible, adaptable data room space; dedicated suites available
Modular design for rapid customization and deployment
Tier 3 compliant design

Power

114 MW usable IT capacity (of 142 MW total campus capacity)
Clean and renewable energy
Medium voltage internal power distribution (2N redundancy)
Industrial grade medium voltage UPS systems
240/415V circuits to cabinet
Supports over 600 kW per cabinet

Cooling

Full free cooling for up to 80% of the year due to cold climate
Committed to a PUE of 1.2 or better
Water cooling system to the cabinet
Fully customizable air and liquid IT cooling solutions
Direct-to-chip, rear-door, and immersion liquid-cooling options

Security

24/7/365 physical security monitoring
On-site security staff 24/7/365
State-of-the-art access control system
ISO 27001-certified information security management system

Connectivity

Carrier neutral
Multiple non-SPOF WAN fiber routes
Direct access to low latency, reliable and redundant telecom networks to major hubs in North America and Europe

Other Services

Office space available with customer lounge area and free parking
Dedicated storage area available
24/7 Smart Hands & Eyes for technical assistance needs
EV charging stations
Shipping and receiving areas with multiple loading docks
Q01 Data Sheet

Get the Full Picture

Specs, floor plans, power architecture — everything in one document.

DOWNLOAD DATA SHEET

Your next cluster has an address.

Tell us what you're building. We'll tell you when you can move in.